Subgrade Preparation for ACBs
Stable and compacted subgrade soil should be prepared to the lines, grades, and cross sections shown on the contract drawings. Termination trenches and transitions between slopes and embankment crests, benches, berms, and toes should be compacted, shaped and unfirmly graded to facilitate the development of intimate contact between the ACB and uniformly graded to facilitate the development of intimate contact between the ACB revetment systems and the underlying grade. Secure the revetments in a manner that prevents soil migration when the ACB matrix is terminated at a structure, such as a concrete slab or wall.

